Trinity College Cambridge, Graduate Accommodation

Trinity College Cambridge will open its doors to the new graduate accommodation development in 2021, it will comprise of 45 En-suite study bedrooms with shared lounges and kitchens, it also features a large ground floor restaurant.

Advanced Showers worked closely with the architects BB+C of Cambridge, main contractors Morgan Sindall and installers Integral to create a Bespoke shower pod for the development.

Our unique 3 piece shower pod design complete with roof is manufactured in the UK from our Coventry factory. The shower pod fits neatly in the alcove of the bathroom to enable every room to have a generous sized shower within the design of the bathroom. Each shower pod section has been constructed with our tried and tested sectional leakproof interlocking design.

The advantage of the shower pods being sectional enables the contractor’s to fit the showers at a later stage of the project and eliminating unnecessary damage from other associated building works.

Shower pods are ideal for student halls for many reasons with fewer maintenance issues and a lower lifetime cost of ownership than traditional time and tray installations.

To find out more about the advantages of installing fibreglass shower pods, please download our free Shower Pods Guide. The new e-book covers a range of topics, including choosing the right style of shower pod, installation guidance and potential cost savings. To speak with an adviser in person, please call 01483 532 020 and we will be happy to answer your questions.

To find out more about shower pods, and how they:

  • Prevent leaks
  • Reduce maintenance
  • Are quick and easy-to-install
  • Are long lasting (and more sustainable)

Then download our FREE guide to Shower Pods by clicking here!

See More Case Studies

See More Case Studies