St Edwards School New Build Boarding House

St Edwards School, Oxford recently completed the new build Co-Ed boarding house, Cooper Lodge.

Working initially with TSH Architects, Advanced Showers provided a Leakproof Shower pod that would incorporate the design layout for the 55 bedrooms with en-suite bathrooms in both Girls & Boys accommodation.

Manufactured from our Coventry factory shower pods were delivered direct to site and installed by main Contractors Feltham Construction.

With the sectional design of Advanced Showers and rapid installation time installers can have our shower pods up and running in no time, multiply that by the number of units in a complete development and you begin to realise the significant cost savings and reduced risk of project overrun.

Bathrooms and showers make up a huge proportion of snagging problems and warranty call-outs. By installing shower pods manufactured by Advanced Showers, Architects, Contractors and end users can rest assured of many years of trouble free showers.

 

To find out more about the advantages of installing fibreglass shower pods, please download our free Shower Pods Guide. The new e-book covers a range of topics, including choosing the right style of shower pod, installation guidance and potential cost savings. To speak with an adviser in person, please call 01483 532 020 and we will be happy to answer your questions.

To find out more about shower pods, and how they:

  • Prevent leaks
  • Reduce maintenance
  • Are quick and easy-to-install
  • Are long lasting (and more sustainable)

Then download our FREE guide to Shower Pods by clicking here!

See More Case Studies

 

 

 

See More Case Studies