Case Studies

University College Marjon Plymouth

The next phase of the Halls of residence refurbishment programme at Marjon’s was to replace all existing showers and create some additional washrooms within Dix accommodation block. Advanced Showers attended the campus to survey the project and along with the appointed contractors, Weatherhead Designers, the showers were manufactured from our Coventry factory and delivered direct to site within two weeks.

Download Brochure

See More Case Studies